Renovated Toronto bathroom with a glass walk-in shower, grey porcelain tile, and an oak floating vanity

Bathroom Renovation Cost Calculator Toronto

When the layout works and the plumbing is sound, your bathroom may need a new look, not a rebuild. A cosmetic update of a 50 sq ft bathroom in Toronto starts at about $9,000 CAD at October 2026 prices.

Leaks, poor ventilation, or a layout that doesn't work call for a full renovation. A full renovation of the same room costs about $19,500 to $36,000 CAD. The low end keeps the plumbing in place with a tub and shower and standard fixtures, and the high end moves the plumbing and adds a walk-in shower, a new fan, and upgraded fixtures.

Compare the two below, then price the work your bathroom needs. Your main bathroom, ensuite, and powder room each get their own size and choices, and your quote adds them up.

Pay Only for the Work Your Bathroom Needs

A cosmetic update keeps the tub, shower, wall tile, and pipes, and replaces the vanity, toilet, faucets, and lights. A full renovation takes the room down to the studs and rebuilds it. Find your bathroom below.

Match what you see in your bathroom to the work it needs.

Your bathroom todayWork it needs
The layout works, and only the look is dated

Cosmetic update

The tub, shower, and wall tile are sound, with no leaks

Cosmetic update

Leaks, cracked tile, or a soft floor

Full renovation

Peeling paint, mould, or steam that stays after a shower

Full renovation

The toilet, sink, or shower needs to move

Full renovation

The tub becomes a walk-in shower

Full renovation

Keep Your Tub or Step Into a Walk-In Shower

Your shower or tub is the largest choice inside a full renovation. A tub with a shower suits baths for young children. A walk-in shower has no tub wall to step over. Answer this in your estimate.

A tub with a shower compared to a walk-in shower.

What you getTub With ShowerWalk-In Shower
Getting in

Step over the tub wall

Step in with no tub wall

Suits

Baths for young children and soaking

Standing showers and easy access at any age

Floor

Flat floor, with the tub over the drain

Sloped floor to its own drain

Waterproofing

Shower walls above the tub

Shower walls and the whole shower floor

Cost

Lower

Higher, for the sloped floor and extra tile

Tiler setting grey porcelain tile in a curbless walk-in shower during a Toronto bathroom renovation
A walk-in shower needs a sloped floor and more tile than a tub with a shower.

What Your Contractor Checks Before Your Final Quote

At your home visit, your contractor checks each item below, and your final quote prices what it finds. See how your quote becomes your final quote.

  • Measurements: The size of your bathroom and where each fixture sits.
  • Floor: Soft spots and rot in the subfloor under your tile.
  • Walls: Water damage behind the tile around your tub or shower.
Contractor checking a bathroom subfloor for water damage before a Toronto bathroom renovation
Your contractor checks your bathroom floor and walls for water damage before your final quote.

Some problems stay hidden until the work opens them up, such as mould inside a wall or a rotted subfloor. Your final quote lists the few most likely in your project, each with its price range. When the work uncovers a hidden problem, listed or not, your contractor shows it to you and sends a written change order with its price and any added days. The repair starts once you sign the change order.

What Your Estimate Includes

Your estimate prices each bathroom on its own, with the work and fixtures you select, and saves it as its own line in your quote.

What your bathroom renovation estimate covers.

CostIn your estimate
Demolition, plumbing, and waterproofing

Included in a full renovation

Vanity, toilet, faucets, fixtures, and tile

Included at the level you select

Moving the toilet, sink, or shower, with the permit application

Included when you select it

New fan and lighting

Included when you select it

Repair for leaks or water damage

Included for the damage you see today, with its price variance under your estimate when you select Not Sure

Replacing a soft or damaged subfloor

Included when your floor feels soft or springy

Frameless glass shower door

Optional, you select it

Hidden damage found once the walls are open

Excluded, noted in your final quote and priced in a written change order you sign first

Drawings, when your work needs a permit

Excluded, prepared by your designer or architect

Building permit fees, when your work needs a permit

Excluded, paid at the City's rate with no markup when your contractor applies

Price Your Bathroom

Your Bathroom

BathroomSelect the bathroom you are pricing.

Each bathroom saves as its own estimate. The basement renovation and legal basement apartment estimates include the basement bathroom.

Type of WorkSelect a full renovation or a cosmetic update.

A full renovation takes the room down to the studs and rebuilds it. A cosmetic update keeps the tub, shower, wall tile, and pipes, and replaces the vanity, toilet, faucets, and lights.

sq ft
Enter the floor area of the bathroom in square feet.

Shower or TubSelect the shower and tub setup you want, or no shower or tub for a powder room.
Toilet, Sink, and ShowerSelect whether the toilet, sink, and shower stay in place or move.

Moving the toilet, sink, or shower needs new drain and water lines and a building permit. Your contractor applies for the permit.

Tile, Fixtures, and Condition

TileSelect how much of the floor and walls get new tile.
Vanity and Fixture LevelSelect the quality level of the vanity, toilet, faucets, and tile.
Fan and LightingSelect whether the bathroom keeps its fan and lights or gets new ones.

A fan vented outside pulls steam out of the room, so the ceiling and walls stay dry.

Leaks or Water DamageSelect the water problem you see in the bathroom today, or Not Sure.

Your estimate includes repair for the problem you select. Select Not Sure, and your estimate prices the most likely answer and shows its price variance until the walls and floor are open.

Tick when the bathroom floor feels soft or springy underfoot. A damaged subfloor gets replaced before new tile goes down.
Tick to add a frameless glass door or panel to the shower.

Location

Enter the first 3 characters of your postal code to apply location-based pricing.

Fill in the fields above to see your price
Pick a time for your contractor to visit and measure for your final quote.Book a home visit

or get it by email or text

Send ByChoose whether to get your quote by email or by text message.

We send a PDF of your line-by-line quote. We call only when you ask.

Enter your email to receive your quote.
Enter your mobile number to receive your quote by text.

Refresh the Rest of Your Home

The basement renovation and legal basement apartment estimates include the basement bathroom.

Each room has its own estimate, and your quote sums up every estimate you save for a whole-home renovation. To take one out, select Delete from quote on its page.

Every True Frame Builders contractor meets our standards for licences, insurance, permits, payments, and warranty before joining.

Keep Your Bathroom Dry With Waterproofing and a Vented Fan

Tile sets the look of your bathroom, and the layers behind it keep the water out. Tile and grout let water through. A waterproof membrane under the tile on the shower walls and floor keeps that water out of the wood framing and subfloor, where it rots out of sight.

A fan vented outside pulls steam out of the room. Without one, moisture soaks into the ceiling and walls, and peeling paint and mould follow. Add a new fan in your estimate.

Premium tile over a failed membrane still leaks. Every full renovation includes the waterproofing, so the finish level you select changes the look of the room, and the membrane keeps it dry.

What a Full Renovation Fixes Behind the Walls

A cosmetic update replaces what you see. A full renovation opens the walls and floor, so your contractor rebuilds the parts that keep the room dry and working.

Contractor applying a waterproofing membrane to shower walls before tiling in a Toronto bathroom renovation
Every wet wall gets a waterproof membrane before the tile goes on.
Contractor venting a new exhaust fan duct outside through an open ceiling in a Toronto bathroom renovation
The new fan vents steam outside the house, which keeps mould and peeling paint off your new walls and ceiling.
New drain and water lines in an opened floor for a relocated toilet in a Toronto bathroom renovation
Fixtures that stay in place reuse their lines, and fixtures that move get new drain and water lines.

Before

Dated Toronto bathroom with an almond tub, beige tile, and an oak vanity before renovation
A dated tub, worn tile, and an old vanity.

After

Toronto bathroom after renovation with a new tub and shower, grey tile, and an oak vanity in the same layout
The tub, toilet, and sink stay in place, which keeps the price near the low end.

Common Questions

How much does a bathroom renovation cost in Toronto?

A full renovation of a 50 sq ft bathroom costs about $19,500 to $36,000 CAD at October 2026 prices. Price your bathroom for a price based on your own room and choices.

Do I need a full renovation, or is a cosmetic update enough?

A cosmetic update fits when the layout works, nothing leaks, and the tub, shower, and wall tile are sound. Leaks, a soft floor, mould, or a fixture that moves call for a full renovation. Find your bathroom in the guide, and your contractor confirms it at your home visit.

Do I need a permit for a bathroom renovation in Toronto?

New fixtures, tile, and vanities in the same spots need no permit. Moving or adding plumbing and structural work each need a building permit. When your work needs a permit, your contractor prepares and submits the application, and your estimate includes that work. City permit fees and the drawings from your designer or architect are separate from your estimate. See the Toronto guide to interior alterations for the City's full rules.

How long does a bathroom renovation take?

A bathroom renovation takes about 1 to 3 months from your contractor's first visit to a finished room. Design and choosing your finishes take 1 to 3 weeks, a permit adds 4 to 6 weeks when your work needs one, and construction takes 3 to 5 weeks.

Can I price my main bathroom, ensuite, and powder room separately?

Yes. Select each bathroom in the estimate and enter its own size and choices. Each one saves as its own estimate, and your quote adds them up. The basement renovation and legal basement apartment estimates include the basement bathroom.

What if there is water damage behind the tile?

Select the water problem you see, and your estimate includes repair for it. Select Not Sure, and your estimate prices the most likely answer and shows its price variance. Your final quote lists the hidden damage most likely in your bathroom, with its price range. When the job uncovers hidden damage, listed or not, True Frame Builders shows it to you and sends a written change order with its price and any added days, and its repair starts once you sign it.